Medium Consumable Manufacturing II Blueprint
Unpublished Structure Module and Rig BlueprintsSearch blueprints...
Production Tree
About Standup M-Set Equipment Manufacturing Time Efficiency II
The Standup M-Set Equipment Manufacturing Time Efficiency II rig provides a means for structure operators to decrease time requirements manufacturing ship modules, ship rigs, personal deployables, implants and cargo containers in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Equipment TE
Volume10 m³
Mass0.2 t
Raw Materials Required
Base materials needed to build 1× Standup M-Set Equipment Manufacturing Time Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit1,200
616.92M ISK
Lorentz Fluid250
575.50M ISK
Current Pump1,200
167.64M ISK
Power Conduit250
92.95M ISK
Nanite Compound14
24.50M ISK
Micro Circuit1,200
5.59M ISK
Power Circuit8
1.90M ISK
Conductive Thermoplastic250
1.45M ISK
Artificial Neural Network1,200
517.44K ISK
Fried Interface Circuit14
62.55K ISK
Nocxium0.36
231.984 ISK
Isogen0.82
156.374 ISK
Mexallon2.22
117.194 ISK
Pyerite4.44
72.372 ISK
Tritanium5.56
21.406 ISK
Total Raw Materials Cost (Jita Sell)1.49B ISK
EVE Online is a trademark of CCP hf. All rights reserved.