IzzyLabbeta

Medium Consumable Manufacturing II Blueprint

Unpublished Structure Module and Rig Blueprints

Production Tree

About Standup M-Set Equipment Manufacturing Time Efficiency II

The Standup M-Set Equipment Manufacturing Time Efficiency II rig provides a means for structure operators to decrease time requirements manufacturing ship modules, ship rigs, personal deployables, implants and cargo containers in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - Equipment TE
Volume10
Mass0.2 t

Market

Best Sell Order1.98B ISK
Best Buy Order946.70M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set Equipment Manufacturing Time Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit1,200
549.84M ISK
Lorentz Fluid250
381.00M ISK
Current Pump1,200
149.88M ISK
Power Conduit250
42.58M ISK
Nanite Compound14
36.39M ISK
Micro Circuit1,200
7.58M ISK
Power Circuit8
2.60M ISK
Artificial Neural Network1,200
1.57M ISK
Conductive Thermoplastic250
1.50M ISK
Fried Interface Circuit14
47.08K ISK
Nocxium0.36
259.668 ISK
Isogen0.82
173.184 ISK
Mexallon2.22
118.615 ISK
Pyerite4.44
84.582 ISK
Tritanium5.56
22.129 ISK
Total Raw Materials Cost (Jita Sell)1.17B ISK
EVE Online is a trademark of CCP hf. All rights reserved.