IzzyLabbeta

Medium Consumable Manufacturing II Blueprint

Unpublished Structure Module and Rig Blueprints

Production Tree

About Standup M-Set Equipment Manufacturing Time Efficiency II

The Standup M-Set Equipment Manufacturing Time Efficiency II rig provides a means for structure operators to decrease time requirements manufacturing ship modules, ship rigs, personal deployables, implants and cargo containers in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - Equipment TE
Volume10
Mass0.2 t

Market

Best Sell Order1.88B ISK
Best Buy Order983.10M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set Equipment Manufacturing Time Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit1,200
708.00M ISK
Lorentz Fluid250
562.00M ISK
Current Pump1,200
131.16M ISK
Power Conduit250
102.70M ISK
Nanite Compound14
29.48M ISK
Micro Circuit1,200
7.13M ISK
Power Circuit8
1.93M ISK
Conductive Thermoplastic250
1.56M ISK
Artificial Neural Network1,200
1.35M ISK
Fried Interface Circuit14
56.70K ISK
Nocxium0.36
252.072 ISK
Isogen0.82
150.798 ISK
Mexallon2.22
119.17 ISK
Pyerite4.44
81.962 ISK
Tritanium5.56
21.573 ISK
Total Raw Materials Cost (Jita Sell)1.55B ISK
EVE Online is a trademark of CCP hf. All rights reserved.