Metenox Moon Drill Blueprint
Structure BlueprintsSearch blueprints...
Production Tree
About Metenox Moon Drill
The Upwell Consortium, renowned for its successful Athanor and Tatara class refineries, recognized the mounting challenges faced by its customers with moon-mining operations. In response, they unveiled the Metenox moon drill, a hands-off deployable employing traditional surface-grazing techniques.
Although these autonomous facilities are less efficient at material extraction than refineries and are more vulnerable to raids due to lighter plating, short reinforcement windows, and also garner high power demands requiring colony reagents, the Consortium insists that their autonomous functionality is a worthy trade-off.
Please note: The Metenox moon drill must be positioned within 250km of an eligible moon mining site and exclusively in systems rated 0.4 security or lower.
Characteristics
TypeUpwell Moon Drill
Volume6,000 m³
Mass3,000,000 t
Jita Market
Best Sell Order684.00M ISK
Best Buy Order600.80M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Metenox Moon Drill from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Integrated Moon Drill Armature1
300.70M ISK
Self-Harmonizing Power Core22
44.00M ISK
Integrity Response Drones15
33.85M ISK
Organic Mortar Applicators33
31.14M ISK
Sterile Conduits20
25.58M ISK
Nano-Factory23
22.32M ISK
Wetware Mainframe10
19.85M ISK
Broadcast Node10
19.32M ISK
Recursive Computing Module12
15.42M ISK
Mexallon245,000
14.44M ISK
Tritanium3,500,000
13.82M ISK
Pyerite700,000
12.78M ISK
Isogen28,000
5.33M ISK
Nocxium5,250
4.22M ISK
Megacyte1,050
2.49M ISK
Zydrine2,450
2.45M ISK
Total Raw Materials Cost (Jita Sell)567.72M ISK
EVE Online is a trademark of CCP hf. All rights reserved.