Metenox Moon Drill Blueprint
Structure BlueprintsSearch blueprints...
Production Tree
About Metenox Moon Drill
The Upwell Consortium, renowned for its successful Athanor and Tatara class refineries, recognized the mounting challenges faced by its customers with moon-mining operations. In response, they unveiled the Metenox moon drill, a hands-off deployable employing traditional surface-grazing techniques.
Although these autonomous facilities are less efficient at material extraction than refineries and are more vulnerable to raids due to lighter plating, short reinforcement windows, and also garner high power demands requiring colony reagents, the Consortium insists that their autonomous functionality is a worthy trade-off.
Please note: The Metenox moon drill must be positioned within 250km of an eligible moon mining site and exclusively in systems rated 0.4 security or lower.
Characteristics
TypeUpwell Moon Drill
Volume6,000 m³
Mass3,000,000 t
Market
Best Sell Order748.20M ISK
Best Buy Order666.20M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Metenox Moon Drill from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Integrated Moon Drill Armature1
346.80M ISK
Self-Harmonizing Power Core22
45.76M ISK
Integrity Response Drones15
37.30M ISK
Organic Mortar Applicators33
36.56M ISK
Nano-Factory23
29.67M ISK
Sterile Conduits20
24.92M ISK
Wetware Mainframe10
23.68M ISK
Broadcast Node10
20.54M ISK
Recursive Computing Module12
19.03M ISK
Tritanium3,500,000
13.65M ISK
Mexallon245,000
13.02M ISK
Pyerite700,000
11.72M ISK
Isogen28,000
5.16M ISK
Nocxium5,250
3.56M ISK
Zydrine2,450
2.60M ISK
Megacyte1,050
2.27M ISK
Total Raw Materials Cost (Jita Sell)636.25M ISK
EVE Online is a trademark of CCP hf. All rights reserved.