Placeholder Sov Hub Upgrade 1 Blueprint
Infrastructure Upgrade BlueprintSearch blueprints...
Production Tree
Characteristics
TypeSovereignty Hub Site Detection Upgrades
Volume5,000 m³
Mass1 t
Raw Materials Required
Base materials needed to build 1× Placeholder Sov Hub Upgrade 1 from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Self-Harmonizing Power Core5
9.73M ISK
Broadcast Node5
9.47M ISK
Integrity Response Drones4
9.38M ISK
Wetware Mainframe4
8.34M ISK
Recursive Computing Module5
7.71M ISK
Sterile Conduits6
7.55M ISK
Organic Mortar Applicators6
6.91M ISK
Nano-Factory6
6.26M ISK
Pyerite105,000
1.96M ISK
Isogen9,000
1.68M ISK
Mexallon30,000
1.60M ISK
Nocxium750
533.92K ISK
Megacyte210
524.16K ISK
Zydrine413
520.38K ISK
Tritanium30,000
115.20K ISK
Hydrocarbons150
56.85K ISK
Atmospheric Gases150
27.66K ISK
Oxygen Isotopes30.94
19.54K ISK
Silicates50
18.70K ISK
Evaporite Deposits50
15.53K ISK
Hydrogen Isotopes28.13
15.49K ISK
Coolant1.18
14.06K ISK
Strontium Clathrates2.63
12.05K ISK
Robotics0.13
10.92K ISK
Enriched Uranium0.53
6.82K ISK
Mechanical Parts0.53
5.22K ISK
Liquid Ozone45.94
4.41K ISK
Heavy Water22.31
2.50K ISK
Oxygen2.89
1.25K ISK
Total Raw Materials Cost (Jita Sell)72.50M ISK
EVE Online is a trademark of CCP hf. All rights reserved.