IzzyLabbeta

Standup L-Set Advanced Component Manufacturing Efficiency I Blueprint

Structure Rig Blueprint

Production Tree

About Standup L-Set Advanced Component Manufacturing Efficiency I

The Standup L-Set Advanced Component Manufacturing Efficiency I rig provides a means for structure operators to decrease both material and time requirements for manufacturing Tech 2 components, Tech 2 capital components, Tools, Data Interfaces and Tech 3 components in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig L - Advanced Component Efficiency
Volume20
Mass0.2 t

Jita Market

Best Sell Order2.58B ISK
Best Buy Order2.51B ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup L-Set Advanced Component Manufacturing Efficiency I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Contaminated Lorentz Fluid12,000
819.00M ISK
Tangled Power Conduit12,000
784.80M ISK
Contaminated Nanite Compound7,200
592.42M ISK
Conductive Polymer12,000
206.88M ISK
Defective Current Pump12,000
197.76M ISK
Smashed Trigger Unit12,000
62.33M ISK
Fried Interface Circuit10,800
40.88M ISK
Tripped Power Circuit3,600
11.84M ISK
Charred Micro Circuit12,000
3.70M ISK
Damaged Artificial Neural Network12,000
2.84M ISK
Total Raw Materials Cost (Jita Sell)2.72B ISK
EVE Online is a trademark of CCP hf. All rights reserved.