Standup L-Set Advanced Component Manufacturing Efficiency II Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup L-Set Advanced Component Manufacturing Efficiency II
The Standup L-Set Advanced Component Manufacturing Efficiency II rig provides a means for structure operators to decrease both material and time requirements for manufacturing Tech 2 components, Tech 2 capital components, Tools, Data Interfaces and Tech 3 components in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig L - Advanced Component Efficiency
Volume20 m³
Mass0.2 t
Jita Market
Best Sell Order24.69B ISK
Best Buy Order50.00M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup L-Set Advanced Component Manufacturing Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit12,000
7.26B ISK
Lorentz Fluid2,000
2.41B ISK
Current Pump12,000
1.30B ISK
Power Conduit2,000
665.00M ISK
Nanite Compound200
264.40M ISK
Power Circuit160
49.92M ISK
Micro Circuit12,000
43.20M ISK
Conductive Thermoplastic2,000
35.12M ISK
Artificial Neural Network10,000
9.24M ISK
Interface Circuit280
3.33M ISK
Nocxium0.36
288 ISK
Isogen0.82
180.4 ISK
Mexallon2.22
139.86 ISK
Pyerite4.44
80.364 ISK
Tritanium5.56
22.24 ISK
Total Raw Materials Cost (Jita Sell)12.04B ISK
EVE Online is a trademark of CCP hf. All rights reserved.