Standup L-Set Basic Capital Component Manufacturing Efficiency II Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup L-Set Basic Capital Component Manufacturing Efficiency II
The Standup L-Set Basic Capital Component Manufacturing Efficiency II rig provides a means for structure operators to decrease both material and time requirements for manufacturing capital ship construction components in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig L - Basic Capital Component Efficiency
Volume20 m³
Mass0.2 t
Jita Market
Best Sell Order24.69B ISK
Best Buy Order373.20M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup L-Set Basic Capital Component Manufacturing Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit12,000
7.19B ISK
Lorentz Fluid2,000
2.50B ISK
Current Pump12,000
1.31B ISK
Power Conduit2,000
707.00M ISK
Nanite Compound200
266.00M ISK
Power Circuit160
49.17M ISK
Micro Circuit12,000
45.72M ISK
Conductive Thermoplastic2,000
35.18M ISK
Artificial Neural Network10,000
9.24M ISK
Interface Circuit280
3.21M ISK
Nocxium0.36
296.1 ISK
Isogen0.82
180.154 ISK
Mexallon2.22
144.7 ISK
Pyerite4.44
83.738 ISK
Tritanium5.56
22.74 ISK
Total Raw Materials Cost (Jita Sell)12.11B ISK
EVE Online is a trademark of CCP hf. All rights reserved.