IzzyLabbeta

Standup L-Set Capital Ship Manufacturing Efficiency I Blueprint

Structure Rig Blueprint

Production Tree

About Standup L-Set Capital Ship Manufacturing Efficiency I

The Standup L-Set Capital Ship Manufacturing Efficiency I rig provides a means for structure operators to decrease both material and time requirements for manufacturing capital ships in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig L - Capital Ship Efficiency
Volume20
Mass0.2 t

Jita Market

Best Sell Order2.40B ISK
Best Buy Order701.00M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup L-Set Capital Ship Manufacturing Efficiency I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Tangled Power Conduit12,000
827.40M ISK
Contaminated Lorentz Fluid12,000
768.24M ISK
Contaminated Nanite Compound7,200
561.60M ISK
Conductive Polymer12,000
206.76M ISK
Defective Current Pump12,000
193.20M ISK
Smashed Trigger Unit12,000
62.42M ISK
Fried Interface Circuit10,800
40.90M ISK
Tripped Power Circuit3,600
11.87M ISK
Charred Micro Circuit12,000
3.27M ISK
Damaged Artificial Neural Network12,000
2.59M ISK
Total Raw Materials Cost (Jita Sell)2.68B ISK
EVE Online is a trademark of CCP hf. All rights reserved.