IzzyLabbeta

Standup L-Set Capital Ship Manufacturing Efficiency I Blueprint

Structure Rig Blueprint

Production Tree

About Standup L-Set Capital Ship Manufacturing Efficiency I

The Standup L-Set Capital Ship Manufacturing Efficiency I rig provides a means for structure operators to decrease both material and time requirements for manufacturing capital ships in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig L - Capital Ship Efficiency
Volume20 m³
Mass0.2 t

Market

Best Sell Order2.35B ISK
Best Buy Order2.01B ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup L-Set Capital Ship Manufacturing Efficiency I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Tangled Power Conduit12,000
851.88M ISK
Contaminated Lorentz Fluid12,000
666.00M ISK
Contaminated Nanite Compound7,200
597.31M ISK
Conductive Polymer12,000
193.56M ISK
Defective Current Pump12,000
129.60M ISK
Smashed Trigger Unit12,000
53.08M ISK
Fried Interface Circuit10,800
47.28M ISK
Tripped Power Circuit3,600
10.79M ISK
Charred Micro Circuit12,000
9.00M ISK
Damaged Artificial Neural Network12,000
7.91M ISK
Total Raw Materials Cost (Jita Sell)2.57B ISK
EVE Online is a trademark of CCP hf. All rights reserved.