Standup L-Set Capital Ship Manufacturing Efficiency II Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup L-Set Capital Ship Manufacturing Efficiency II
The Standup L-Set Capital Ship Manufacturing Efficiency II rig provides a means for structure operators to decrease both material and time requirements for manufacturing capital ships in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig L - Capital Ship Efficiency
Volume20 m³
Mass0.2 t
Market
Best Sell Order19.97B ISK
Best Buy Order1.25B ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup L-Set Capital Ship Manufacturing Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit12,000
6.17B ISK
Lorentz Fluid2,000
4.60B ISK
Current Pump12,000
1.68B ISK
Power Conduit2,000
743.60M ISK
Nanite Compound200
350.00M ISK
Micro Circuit12,000
55.88M ISK
Power Circuit160
38.05M ISK
Conductive Thermoplastic2,000
11.60M ISK
Interface Circuit280
4.97M ISK
Artificial Neural Network10,000
4.31M ISK
Nocxium0.36
231.984 ISK
Isogen0.82
156.374 ISK
Mexallon2.22
117.194 ISK
Pyerite4.44
72.372 ISK
Tritanium5.56
21.406 ISK
Total Raw Materials Cost (Jita Sell)13.66B ISK
EVE Online is a trademark of CCP hf. All rights reserved.