IzzyLabbeta

Standup L-Set Capital Ship Manufacturing Efficiency II Blueprint

Structure Rig Blueprint

Production Tree

About Standup L-Set Capital Ship Manufacturing Efficiency II

The Standup L-Set Capital Ship Manufacturing Efficiency II rig provides a means for structure operators to decrease both material and time requirements for manufacturing capital ships in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig L - Capital Ship Efficiency
Volume20
Mass0.2 t

Jita Market

Best Sell Order24.69B ISK
Best Buy Order50.00M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup L-Set Capital Ship Manufacturing Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit12,000
10.36B ISK
Lorentz Fluid2,000
1.90B ISK
Power Conduit2,000
922.20M ISK
Current Pump12,000
724.32M ISK
Nanite Compound200
270.00M ISK
Conductive Thermoplastic2,000
46.28M ISK
Micro Circuit12,000
40.80M ISK
Power Circuit160
39.54M ISK
Artificial Neural Network10,000
8.74M ISK
Interface Circuit280
2.53M ISK
Nocxium0.36
289.044 ISK
Isogen0.82
156.128 ISK
Mexallon2.22
130.825 ISK
Pyerite4.44
81.074 ISK
Tritanium5.56
21.962 ISK
Total Raw Materials Cost (Jita Sell)14.31B ISK
EVE Online is a trademark of CCP hf. All rights reserved.