IzzyLabbeta

Standup L-Set Equipment Manufacturing Efficiency II Blueprint

Structure Rig Blueprint

Production Tree

About Standup L-Set Equipment Manufacturing Efficiency II

The Standup L-Set Equipment Manufacturing Efficiency II rig provides a means for structure operators to decrease both material and time requirements manufacturing ship modules, ship rigs, personal deployables, implants and cargo containers in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig L - Equipment Efficiency
Volume20
Mass0.2 t

Jita Market

Best Sell Order19.00B ISK
Best Buy Order50.00M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup L-Set Equipment Manufacturing Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit12,000
7.50B ISK
Lorentz Fluid2,000
2.35B ISK
Current Pump12,000
1.31B ISK
Power Conduit2,000
715.00M ISK
Nanite Compound200
264.40M ISK
Power Circuit160
58.06M ISK
Micro Circuit12,000
46.56M ISK
Conductive Thermoplastic2,000
35.32M ISK
Artificial Neural Network10,000
9.25M ISK
Interface Circuit280
3.36M ISK
Nocxium0.36
284.076 ISK
Isogen0.82
192.618 ISK
Mexallon2.22
135.087 ISK
Pyerite4.44
80.408 ISK
Tritanium5.56
22.629 ISK
Total Raw Materials Cost (Jita Sell)12.29B ISK
EVE Online is a trademark of CCP hf. All rights reserved.