IzzyLabbeta

Standup L-Set Invention Optimization II Blueprint

Structure Rig Blueprint

Production Tree

About Standup L-Set Invention Optimization II

The Standup L-Set Invention Optimization II rig provides a means for structure operators to decrease both cost and time requirements for invention in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig L - Invention Optimization
Volume20
Mass0.2 t

Jita Market

Best Sell Order14.97B ISK
Best Buy Order50.00M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup L-Set Invention Optimization II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit7,000
4.44B ISK
Telemetry Processor7,000
1.34B ISK
Impetus Console13,000
1.14B ISK
Current Pump7,000
801.50M ISK
Drone Transceiver7,000
423.22M ISK
Logic Circuit160
349.28M ISK
Micro Circuit7,000
29.09M ISK
Capacitor Console160
27.52M ISK
Artificial Neural Network7,000
6.47M ISK
Interface Circuit160
1.90M ISK
Nocxium0.36
297.432 ISK
Isogen0.82
179.58 ISK
Mexallon2.22
141.148 ISK
Pyerite4.44
83.605 ISK
Tritanium5.56
22.796 ISK
Total Raw Materials Cost (Jita Sell)8.56B ISK
EVE Online is a trademark of CCP hf. All rights reserved.