Standup L-Set ME Research Optimization I Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup L-Set ME Research Optimization I
The Standup L-Set ME Research Optimization I rig provides a means for structure operators to decrease both cost and time requirements for material efficiency research in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig L - ME Research Optimization
Volume20 m³
Mass0.2 t
Market
Best Sell Order890.00M ISK
Best Buy Order749.60M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup L-Set ME Research Optimization I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Defective Current Pump24,000
231.48M ISK
Thruster Console24,000
165.94M ISK
Smashed Trigger Unit24,000
115.61M ISK
Burned Logic Circuit2,400
94.08M ISK
Fried Interface Circuit12,000
53.22M ISK
Scorched Telemetry Processor24,000
50.71M ISK
Broken Drone Transceiver24,000
49.27M ISK
Melted Capacitor Console12,000
47.06M ISK
Charred Micro Circuit24,000
18.24M ISK
Damaged Artificial Neural Network24,000
15.91M ISK
Total Raw Materials Cost (Jita Sell)841.52M ISK
EVE Online is a trademark of CCP hf. All rights reserved.