IzzyLabbeta

Standup L-Set Target Acquisition Array I Blueprint

Structure Rig Blueprint

Production Tree

About Standup L-Set Target Acquisition Array I

The Standup L-Set Target Acquisition Array I rig provides a means for structure operators to adjust hardware systems involved in acquiring and resolving targets so as to increase the maximum number of targets, overall scan resolution, and maximum targeting range of Upwell technology structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Combat Rig L - Max Targets and Sensor Boosting
Volume20
Mass0.2 t

Jita Market

Best Sell Order2.50B ISK
Best Buy Order1.09B ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup L-Set Target Acquisition Array I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Tangled Power Conduit7,500
570.00M ISK
Contaminated Lorentz Fluid7,500
540.00M ISK
Conductive Polymer7,500
138.75M ISK
Ward Console5,000
68.00M ISK
Thruster Console7,500
61.11M ISK
Scorched Telemetry Processor7,500
16.36M ISK
Broken Drone Transceiver7,500
16.27M ISK
Malfunctioning Shield Emitter7,500
3.74M ISK
Alloyed Tritanium Bar1,625
2.91M ISK
Damaged Artificial Neural Network7,500
1.61M ISK
Total Raw Materials Cost (Jita Sell)1.42B ISK
EVE Online is a trademark of CCP hf. All rights reserved.