Standup M-Set Advanced Component Manufacturing Material Efficiency II Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Advanced Component Manufacturing Material Efficiency II
The Standup M-Set Advanced Component Manufacturing Material Efficiency II rig provides a means for structure operators to decrease material requirements for manufacturing Tech 2 components, Tech 2 capital components, Tools, Data Interfaces and Tech 3 components in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Advanced Component ME
Volume10 m³
Mass0.2 t
Market
Best Sell Order1.40B ISK
Best Buy Order995.60M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Advanced Component Manufacturing Material Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit1,200
708.00M ISK
Lorentz Fluid200
449.60M ISK
Current Pump1,200
131.16M ISK
Power Conduit200
82.16M ISK
Nanite Compound20
42.12M ISK
Micro Circuit1,200
7.13M ISK
Power Circuit16
3.87M ISK
Conductive Thermoplastic200
1.25M ISK
Artificial Neural Network1,000
1.13M ISK
Interface Circuit28
542.64K ISK
Nocxium0.36
252.072 ISK
Isogen0.82
150.798 ISK
Mexallon2.22
119.17 ISK
Pyerite4.44
81.962 ISK
Tritanium5.56
21.573 ISK
Total Raw Materials Cost (Jita Sell)1.43B ISK
EVE Online is a trademark of CCP hf. All rights reserved.