Standup M-Set Ammunition Manufacturing Time Efficiency I Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Ammunition Manufacturing Time Efficiency I
The Standup M-Set Ammunition Manufacturing Time Efficiency I rig provides a means for structure operators to decrease time requirements manufacturing ammunition, charges and scripts in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Ammunition TE
Volume10 m³
Mass0.2 t
Market
Best Sell Order690.00M ISK
Best Buy Order280.40M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Ammunition Manufacturing Time Efficiency I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Tangled Power Conduit1,600
147.98M ISK
Contaminated Lorentz Fluid1,600
118.80M ISK
Contaminated Nanite Compound960
84.29M ISK
Conductive Polymer1,600
32.62M ISK
Defective Current Pump1,600
19.09M ISK
Smashed Trigger Unit1,600
8.16M ISK
Fried Interface Circuit1,440
6.01M ISK
Charred Micro Circuit1,600
2.39M ISK
Damaged Artificial Neural Network1,600
2.05M ISK
Total Raw Materials Cost (Jita Sell)421.39M ISK
EVE Online is a trademark of CCP hf. All rights reserved.