IzzyLabbeta

Standup M-Set Ammunition Manufacturing Time Efficiency II Blueprint

Structure Rig Blueprint

Production Tree

About Standup M-Set Ammunition Manufacturing Time Efficiency II

The Standup M-Set Ammunition Manufacturing Time Efficiency II rig provides a means for structure operators to decrease time requirements manufacturing ammunition, charges and scripts in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - Ammunition TE
Volume10
Mass0.2 t

Jita Market

Best Sell Order2.12B ISK
Best Buy Order1.00B ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set Ammunition Manufacturing Time Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit1,200
684.00M ISK
Lorentz Fluid200
243.60M ISK
Current Pump1,200
116.50M ISK
Power Conduit200
71.36M ISK
Nanite Compound20
27.72M ISK
Power Circuit16
5.01M ISK
Micro Circuit1,200
4.66M ISK
Conductive Thermoplastic200
3.80M ISK
Artificial Neural Network1,000
924.00K ISK
Interface Circuit28
326.20K ISK
Nocxium0.36
295.56 ISK
Isogen0.82
194.422 ISK
Mexallon2.22
144.122 ISK
Pyerite4.44
83.383 ISK
Tritanium5.56
20.683 ISK
Total Raw Materials Cost (Jita Sell)1.16B ISK
EVE Online is a trademark of CCP hf. All rights reserved.