Standup M-Set Basic Capital Component Manufacturing Material Efficiency I Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Basic Capital Component Manufacturing Material Efficiency I
The Standup M-Set Basic Capital Component Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements when manufacturing capital ship construction components in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Basic Capital Component ME
Volume10 m³
Mass0.2 t
Market
Best Sell Order350.00M ISK
Best Buy Order314.20M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Basic Capital Component Manufacturing Material Efficiency I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Tangled Power Conduit1,600
115.38M ISK
Contaminated Lorentz Fluid1,600
100.85M ISK
Contaminated Nanite Compound960
71.30M ISK
Conductive Polymer1,600
30.13M ISK
Defective Current Pump1,600
20.64M ISK
Smashed Trigger Unit1,600
8.14M ISK
Fried Interface Circuit1,440
5.97M ISK
Charred Micro Circuit1,600
580.00K ISK
Damaged Artificial Neural Network1,600
384.48K ISK
Total Raw Materials Cost (Jita Sell)353.37M ISK
EVE Online is a trademark of CCP hf. All rights reserved.