Standup M-Set Basic Capital Component Manufacturing Material Efficiency II Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Basic Capital Component Manufacturing Material Efficiency II
The Standup M-Set Basic Capital Component Manufacturing Material Efficiency II rig provides a means for structure operators to decrease material requirements when manufacturing capital ship construction components in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Basic Capital Component ME
Volume10 m³
Mass0.2 t
Market
Best Sell Order1.42B ISK
Best Buy Order974.60M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Basic Capital Component Manufacturing Material Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit1,200
732.00M ISK
Lorentz Fluid200
460.00M ISK
Current Pump1,200
135.96M ISK
Power Conduit200
78.20M ISK
Nanite Compound20
37.68M ISK
Micro Circuit1,200
7.04M ISK
Power Circuit16
4.00M ISK
Conductive Thermoplastic200
1.24M ISK
Artificial Neural Network1,000
1.12M ISK
Interface Circuit28
570.64K ISK
Nocxium0.36
257.256 ISK
Isogen0.82
147.518 ISK
Mexallon2.22
118.282 ISK
Pyerite4.44
82.184 ISK
Tritanium5.56
22.073 ISK
Total Raw Materials Cost (Jita Sell)1.46B ISK
EVE Online is a trademark of CCP hf. All rights reserved.