Standup M-Set Basic Capital Component Manufacturing Time Efficiency I Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Basic Capital Component Manufacturing Time Efficiency I
The Standup M-Set Basic Capital Component Manufacturing Time Efficiency I rig provides a means for structure operators to decrease time requirements when manufacturing capital ship construction components in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Basic Capital Component TE
Volume10 m³
Mass0.2 t
Jita Market
Best Sell Order440.00M ISK
Best Buy Order300.10M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Basic Capital Component Manufacturing Time Efficiency I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Tangled Power Conduit1,600
159.97M ISK
Contaminated Lorentz Fluid1,600
122.40M ISK
Contaminated Nanite Compound960
82.43M ISK
Conductive Polymer1,600
32.16M ISK
Defective Current Pump1,600
16.29M ISK
Smashed Trigger Unit1,600
12.66M ISK
Fried Interface Circuit1,440
4.52M ISK
Charred Micro Circuit1,600
398.40K ISK
Damaged Artificial Neural Network1,600
398.08K ISK
Total Raw Materials Cost (Jita Sell)431.22M ISK
EVE Online is a trademark of CCP hf. All rights reserved.