Standup M-Set Basic Capital Component Manufacturing Time Efficiency II Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Basic Capital Component Manufacturing Time Efficiency II
The Standup M-Set Basic Capital Component Manufacturing Time Efficiency II rig provides a means for structure operators to decrease time requirements when manufacturing capital ship construction components in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Basic Capital Component TE
Volume10 m³
Mass0.2 t
Jita Market
Best Sell Order1.80B ISK
Best Buy Order1.00B ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Basic Capital Component Manufacturing Time Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit1,200
725.64M ISK
Lorentz Fluid200
232.80M ISK
Current Pump1,200
121.32M ISK
Power Conduit200
69.16M ISK
Nanite Compound20
26.18M ISK
Power Circuit16
5.12M ISK
Micro Circuit1,200
4.58M ISK
Conductive Thermoplastic200
3.85M ISK
Artificial Neural Network1,000
1.26M ISK
Interface Circuit28
332.64K ISK
Nocxium0.36
284.976 ISK
Isogen0.82
178.104 ISK
Mexallon2.22
143.723 ISK
Pyerite4.44
81.163 ISK
Tritanium5.56
22.518 ISK
Total Raw Materials Cost (Jita Sell)1.19B ISK
EVE Online is a trademark of CCP hf. All rights reserved.