Standup M-Set Basic Large Ship Manufacturing Time Efficiency I Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Basic Large Ship Manufacturing Time Efficiency I
The Standup M-Set Basic Large Ship Manufacturing Time Efficiency I rig provides a means for structure operators to decrease time requirements for manufacturing battleships, freighters and industrial command ships in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Basic Large Ship TE
Volume10 m³
Mass0.2 t
Market
Best Sell Order475.00M ISK
Best Buy Order260.10M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Basic Large Ship Manufacturing Time Efficiency I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Tangled Power Conduit1,600
114.06M ISK
Contaminated Lorentz Fluid1,600
90.88M ISK
Contaminated Nanite Compound960
82.45M ISK
Conductive Polymer1,600
26.99M ISK
Defective Current Pump1,600
16.72M ISK
Smashed Trigger Unit1,600
7.08M ISK
Fried Interface Circuit1,440
6.84M ISK
Charred Micro Circuit1,600
1.04M ISK
Damaged Artificial Neural Network1,600
832.48K ISK
Total Raw Materials Cost (Jita Sell)346.90M ISK