IzzyLabbeta

Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I Blueprint

Structure Rig Blueprint

Production Tree

About Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I

The Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I rig provides a means for structure operators to decrease time requirements for manufacturing cruisers, battlecruisers, industrial ships and mining barges in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - Basic Medium Ship TE
Volume10
Mass0.2 t

Market

Best Sell Order549.00M ISK
Best Buy Order275.50M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Tangled Power Conduit1,600
167.68M ISK
Contaminated Lorentz Fluid1,600
124.77M ISK
Contaminated Nanite Compound960
77.66M ISK
Conductive Polymer1,600
34.02M ISK
Defective Current Pump1,600
20.32M ISK
Smashed Trigger Unit1,600
9.31M ISK
Fried Interface Circuit1,440
6.32M ISK
Charred Micro Circuit1,600
2.67M ISK
Damaged Artificial Neural Network1,600
1.60M ISK
Total Raw Materials Cost (Jita Sell)444.34M ISK
EVE Online is a trademark of CCP hf. All rights reserved.