IzzyLabbeta

Standup M-Set Basic Small Ship Manufacturing Time Efficiency II Blueprint

Structure Rig Blueprint

Production Tree

About Standup M-Set Basic Small Ship Manufacturing Time Efficiency II

The Standup M-Set Basic Small Ship Manufacturing Time Efficiency II rig provides a means for structure operators to decrease time requirements for manufacturing frigates, destroyers and shuttles in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - Basic Small Ship TE
Volume10
Mass0.2 t

Jita Market

Best Sell Order2.25B ISK
Best Buy Order1.36B ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set Basic Small Ship Manufacturing Time Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit1,200
1.04B ISK
Lorentz Fluid200
189.60M ISK
Power Conduit200
92.22M ISK
Current Pump1,200
72.43M ISK
Nanite Compound20
27.00M ISK
Conductive Thermoplastic200
4.63M ISK
Micro Circuit1,200
4.08M ISK
Power Circuit16
3.95M ISK
Artificial Neural Network1,000
874.20K ISK
Interface Circuit28
252.56K ISK
Nocxium0.36
289.044 ISK
Isogen0.82
156.128 ISK
Mexallon2.22
130.825 ISK
Pyerite4.44
81.074 ISK
Tritanium5.56
21.962 ISK
Total Raw Materials Cost (Jita Sell)1.43B ISK
EVE Online is a trademark of CCP hf. All rights reserved.