Standup M-Set Blueprint Copy Cost Optimization I Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Blueprint Copy Cost Optimization I
The Standup M-Set Blueprint Copy Cost Optimization I rig provides a means for structure operators to decrease cost requirements when copying in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Blueprint Copy Cost Optimization
Volume10 m³
Mass0.2 t
Jita Market
Best Sell Order249.00M ISK
Best Buy Order104.80M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Blueprint Copy Cost Optimization I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Defective Current Pump3,200
32.58M ISK
Thruster Console3,200
29.88M ISK
Smashed Trigger Unit3,200
25.32M ISK
Broken Drone Transceiver3,200
9.32M ISK
Burned Logic Circuit320
9.17M ISK
Scorched Telemetry Processor3,200
7.28M ISK
Melted Capacitor Console1,600
6.82M ISK
Fried Interface Circuit1,600
5.02M ISK
Charred Micro Circuit3,200
796.80K ISK
Damaged Artificial Neural Network3,200
796.16K ISK
Total Raw Materials Cost (Jita Sell)126.99M ISK
EVE Online is a trademark of CCP hf. All rights reserved.