IzzyLabbeta

Standup M-Set Blueprint Copy Cost Optimization I Blueprint

Structure Rig Blueprint

Production Tree

About Standup M-Set Blueprint Copy Cost Optimization I

The Standup M-Set Blueprint Copy Cost Optimization I rig provides a means for structure operators to decrease cost requirements when copying in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - Blueprint Copy Cost Optimization
Volume10
Mass0.2 t

Market

Best Sell Order117.00M ISK
Best Buy Order100.10M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set Blueprint Copy Cost Optimization I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Defective Current Pump3,200
40.64M ISK
Thruster Console3,200
23.65M ISK
Smashed Trigger Unit3,200
18.62M ISK
Burned Logic Circuit320
14.08M ISK
Broken Drone Transceiver3,200
9.28M ISK
Scorched Telemetry Processor3,200
8.83M ISK
Fried Interface Circuit1,600
7.02M ISK
Melted Capacitor Console1,600
5.70M ISK
Charred Micro Circuit3,200
5.33M ISK
Damaged Artificial Neural Network3,200
3.20M ISK
Total Raw Materials Cost (Jita Sell)136.35M ISK
EVE Online is a trademark of CCP hf. All rights reserved.