Standup M-Set Blueprint Copy Cost Optimization I Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Blueprint Copy Cost Optimization I
The Standup M-Set Blueprint Copy Cost Optimization I rig provides a means for structure operators to decrease cost requirements when copying in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Blueprint Copy Cost Optimization
Volume10 m³
Mass0.2 t
Market
Best Sell Order112.00M ISK
Best Buy Order98.87M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Blueprint Copy Cost Optimization I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Defective Current Pump3,200
33.44M ISK
Thruster Console3,200
23.94M ISK
Smashed Trigger Unit3,200
14.16M ISK
Burned Logic Circuit320
12.80M ISK
Broken Drone Transceiver3,200
8.94M ISK
Scorched Telemetry Processor3,200
8.44M ISK
Fried Interface Circuit1,600
7.60M ISK
Melted Capacitor Console1,600
6.15M ISK
Charred Micro Circuit3,200
2.08M ISK
Damaged Artificial Neural Network3,200
1.66M ISK
Total Raw Materials Cost (Jita Sell)119.21M ISK
EVE Online is a trademark of CCP hf. All rights reserved.