Standup M-Set Blueprint Copy Cost Optimization II Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Blueprint Copy Cost Optimization II
The Standup M-Set Blueprint Copy Cost Optimization II rig provides a means for structure operators to decrease cost requirements when copying in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Blueprint Copy Cost Optimization
Volume10 m³
Mass0.2 t
Market
Best Sell Order2.20B ISK
Best Buy Order50.00M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Blueprint Copy Cost Optimization II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit700
371.70M ISK
Telemetry Processor700
118.86M ISK
Impetus Console1,300
99.68M ISK
Current Pump700
94.99M ISK
Logic Circuit16
30.19M ISK
Drone Transceiver700
27.29M ISK
Micro Circuit700
3.70M ISK
Capacitor Console16
2.74M ISK
Artificial Neural Network700
615.23K ISK
Interface Circuit16
286.72K ISK
Nocxium0.36
228.6 ISK
Isogen0.82
149.404 ISK
Mexallon2.22
116.217 ISK
Pyerite4.44
74.681 ISK
Tritanium5.56
21.962 ISK
Total Raw Materials Cost (Jita Sell)750.07M ISK
EVE Online is a trademark of CCP hf. All rights reserved.