IzzyLabbeta

Standup M-Set Blueprint Copy Cost Optimization II Blueprint

Structure Rig Blueprint

Production Tree

About Standup M-Set Blueprint Copy Cost Optimization II

The Standup M-Set Blueprint Copy Cost Optimization II rig provides a means for structure operators to decrease cost requirements when copying in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - Blueprint Copy Cost Optimization
Volume10
Mass0.2 t

Jita Market

Best Sell Order2.29B ISK
Best Buy Order50.00M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set Blueprint Copy Cost Optimization II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit700
423.29M ISK
Impetus Console1,300
120.24M ISK
Telemetry Processor700
108.22M ISK
Current Pump700
70.77M ISK
Drone Transceiver700
48.12M ISK
Logic Circuit16
35.98M ISK
Capacitor Console16
2.69M ISK
Micro Circuit700
2.67M ISK
Artificial Neural Network700
882.70K ISK
Interface Circuit16
190.08K ISK
Nocxium0.36
284.976 ISK
Isogen0.82
178.104 ISK
Mexallon2.22
143.723 ISK
Pyerite4.44
81.163 ISK
Tritanium5.56
22.518 ISK
Total Raw Materials Cost (Jita Sell)813.06M ISK
EVE Online is a trademark of CCP hf. All rights reserved.