IzzyLabbeta

Standup M-Set Blueprint Copy Cost Optimization II Blueprint

Structure Rig Blueprint

Production Tree

About Standup M-Set Blueprint Copy Cost Optimization II

The Standup M-Set Blueprint Copy Cost Optimization II rig provides a means for structure operators to decrease cost requirements when copying in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - Blueprint Copy Cost Optimization
Volume10
Mass0.2 t

Jita Market

Best Sell Order2.29B ISK
Best Buy Order50.00M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set Blueprint Copy Cost Optimization II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit700
604.59M ISK
Impetus Console1,300
103.40M ISK
Telemetry Processor700
53.25M ISK
Current Pump700
42.25M ISK
Drone Transceiver700
36.68M ISK
Logic Circuit16
30.62M ISK
Capacitor Console16
3.52M ISK
Micro Circuit700
2.38M ISK
Artificial Neural Network700
611.94K ISK
Interface Circuit16
144.32K ISK
Nocxium0.36
289.044 ISK
Isogen0.82
156.128 ISK
Mexallon2.22
130.825 ISK
Pyerite4.44
81.074 ISK
Tritanium5.56
21.962 ISK
Total Raw Materials Cost (Jita Sell)877.46M ISK
EVE Online is a trademark of CCP hf. All rights reserved.