IzzyLabbeta

Standup M-Set Equipment Manufacturing Material Efficiency II Blueprint

Structure Rig Blueprint

Production Tree

About Standup M-Set Equipment Manufacturing Material Efficiency II

The Standup M-Set Equipment Manufacturing Material Efficiency II rig provides a means for structure operators to decrease material requirements manufacturing ship modules, ship rigs, personal deployables, implants and cargo containers in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - Equipment ME
Volume10 m³
Mass0.2 t

Market

Best Sell Order1.38B ISK
Best Buy Order1.22B ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set Equipment Manufacturing Material Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit1,200
620.52M ISK
Lorentz Fluid200
464.80M ISK
Current Pump1,200
160.56M ISK
Power Conduit200
78.60M ISK
Nanite Compound20
34.98M ISK
Micro Circuit1,200
6.59M ISK
Power Circuit16
4.00M ISK
Conductive Thermoplastic200
1.24M ISK
Artificial Neural Network1,000
888.00K ISK
Interface Circuit28
518.84K ISK
Nocxium0.36
243.72 ISK
Isogen0.82
157.276 ISK
Mexallon2.22
118.437 ISK
Pyerite4.44
74.37 ISK
Tritanium5.56
21.851 ISK
Total Raw Materials Cost (Jita Sell)1.37B ISK
EVE Online is a trademark of CCP hf. All rights reserved.