Standup M-Set Invention Cost Optimization I Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Invention Cost Optimization I
The Standup M-Set Invention Cost Optimization I rig provides a means for structure operators to decrease cost requirements when performing invention in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Invention Cost Optimization
Volume10 m³
Mass0.2 t
Jita Market
Best Sell Order148.90M ISK
Best Buy Order103.70M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Invention Cost Optimization I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Defective Current Pump3,200
56.13M ISK
Thruster Console3,200
25.98M ISK
Smashed Trigger Unit3,200
16.57M ISK
Burned Logic Circuit320
13.76M ISK
Melted Capacitor Console1,600
7.94M ISK
Broken Drone Transceiver3,200
6.98M ISK
Scorched Telemetry Processor3,200
6.72M ISK
Fried Interface Circuit1,600
5.87M ISK
Charred Micro Circuit3,200
854.08K ISK
Damaged Artificial Neural Network3,200
751.68K ISK
Total Raw Materials Cost (Jita Sell)141.54M ISK
EVE Online is a trademark of CCP hf. All rights reserved.