IzzyLabbeta

Standup M-Set ME Research Cost Optimization I Blueprint

Structure Rig Blueprint

Production Tree

About Standup M-Set ME Research Cost Optimization I

The Standup M-Set ME Research Cost Optimization I rig provides a means for structure operators to decrease cost requirements when performing material efficiency research in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - ME Research Cost Optimization
Volume10
Mass0.2 t

Market

Best Sell Order113.00M ISK
Best Buy Order86.99M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set ME Research Cost Optimization I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Defective Current Pump3,200
37.92M ISK
Thruster Console3,200
27.03M ISK
Smashed Trigger Unit3,200
15.94M ISK
Burned Logic Circuit320
14.90M ISK
Broken Drone Transceiver3,200
9.60M ISK
Scorched Telemetry Processor3,200
8.07M ISK
Fried Interface Circuit1,600
5.38M ISK
Melted Capacitor Console1,600
4.75M ISK
Charred Micro Circuit3,200
1.14M ISK
Damaged Artificial Neural Network3,200
667.20K ISK
Total Raw Materials Cost (Jita Sell)125.40M ISK
EVE Online is a trademark of CCP hf. All rights reserved.