About Standup M-Set ME Research Cost Optimization I
The Standup M-Set ME Research Cost Optimization I rig provides a means for structure operators to decrease cost requirements when performing material efficiency research in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - ME Research Cost Optimization
Volume10 m³
Mass0.2 t
Jita Market
Best Sell Order139.90M ISK
Best Buy Order92.62M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set ME Research Cost Optimization I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Defective Current Pump3,200
52.74M ISK
Thruster Console3,200
25.95M ISK
Smashed Trigger Unit3,200
16.62M ISK
Burned Logic Circuit320
14.28M ISK
Melted Capacitor Console1,600
7.62M ISK
Broken Drone Transceiver3,200
7.36M ISK
Scorched Telemetry Processor3,200
6.90M ISK
Fried Interface Circuit1,600
6.06M ISK
Charred Micro Circuit3,200
985.60K ISK
Damaged Artificial Neural Network3,200
758.40K ISK
Total Raw Materials Cost (Jita Sell)139.27M ISK