Standup M-Set ME Research Cost Optimization II Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set ME Research Cost Optimization II
The Standup M-Set ME Research Cost Optimization II rig provides a means for structure operators to decrease cost requirements when performing material efficiency research in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - ME Research Cost Optimization
Volume10 m³
Mass0.2 t
Market
Best Sell Order1.32B ISK
Best Buy Order715.00M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set ME Research Cost Optimization II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit700
427.00M ISK
Telemetry Processor700
154.49M ISK
Impetus Console1,300
124.80M ISK
Current Pump700
79.31M ISK
Drone Transceiver700
32.22M ISK
Logic Circuit16
32.08M ISK
Micro Circuit700
4.11M ISK
Capacitor Console16
2.90M ISK
Artificial Neural Network700
781.90K ISK
Interface Circuit16
326.08K ISK
Nocxium0.36
257.256 ISK
Isogen0.82
147.518 ISK
Mexallon2.22
118.282 ISK
Pyerite4.44
82.184 ISK
Tritanium5.56
22.073 ISK
Total Raw Materials Cost (Jita Sell)858.02M ISK
EVE Online is a trademark of CCP hf. All rights reserved.