IzzyLabbeta

Standup M-Set Structure Manufacturing Material Efficiency II Blueprint

Structure Rig Blueprint

Production Tree

About Standup M-Set Structure Manufacturing Material Efficiency II

The Standup M-Set Structure Manufacturing Material Efficiency II rig provides a means for structure operators to decrease material requirements when manufacturing structure components, structure modules, structure rigs, Upwell structures, starbase structures and fuel blocks in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - Structure ME
Volume10
Mass0.2 t

Jita Market

Best Sell Order1.70B ISK
Best Buy Order1.15B ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set Structure Manufacturing Material Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit1,200
725.64M ISK
Lorentz Fluid200
232.80M ISK
Current Pump1,200
121.32M ISK
Power Conduit200
69.16M ISK
Nanite Compound20
26.18M ISK
Power Circuit16
5.12M ISK
Micro Circuit1,200
4.58M ISK
Conductive Thermoplastic200
3.85M ISK
Artificial Neural Network1,000
1.26M ISK
Interface Circuit28
332.64K ISK
Nocxium0.36
284.976 ISK
Isogen0.82
178.104 ISK
Mexallon2.22
143.723 ISK
Pyerite4.44
81.163 ISK
Tritanium5.56
22.518 ISK
Total Raw Materials Cost (Jita Sell)1.19B ISK
EVE Online is a trademark of CCP hf. All rights reserved.