IzzyLabbeta

Standup M-Set Structure Manufacturing Time Efficiency I Blueprint

Structure Rig Blueprint

Production Tree

About Standup M-Set Structure Manufacturing Time Efficiency I

The Standup M-Set Structure Manufacturing Time Efficiency I rig provides a means for structure operators to decrease time requirements when manufacturing structure components, structure modules, structure rigs, Upwell structures, starbase structures and fuel blocks in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - Structure TE
Volume10
Mass0.2 t

Jita Market

Best Sell Order699.70M ISK
Best Buy Order297.90M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set Structure Manufacturing Time Efficiency I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Tangled Power Conduit1,600
117.36M ISK
Contaminated Lorentz Fluid1,600
108.80M ISK
Contaminated Nanite Compound960
76.80M ISK
Conductive Polymer1,600
28.22M ISK
Defective Current Pump1,600
28.06M ISK
Smashed Trigger Unit1,600
8.29M ISK
Fried Interface Circuit1,440
5.28M ISK
Charred Micro Circuit1,600
427.04K ISK
Damaged Artificial Neural Network1,600
375.84K ISK
Total Raw Materials Cost (Jita Sell)373.62M ISK
EVE Online is a trademark of CCP hf. All rights reserved.