Standup M-Set Structure Manufacturing Time Efficiency II Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set Structure Manufacturing Time Efficiency II
The Standup M-Set Structure Manufacturing Time Efficiency II rig provides a means for structure operators to decrease time requirements when manufacturing structure components, structure modules, structure rigs, Upwell structures, starbase structures and fuel blocks in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - Structure TE
Volume10 m³
Mass0.2 t
Jita Market
Best Sell Order2.00B ISK
Best Buy Order1.03B ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set Structure Manufacturing Time Efficiency II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit1,200
718.56M ISK
Lorentz Fluid200
250.00M ISK
Current Pump1,200
130.56M ISK
Power Conduit200
70.70M ISK
Nanite Compound20
26.60M ISK
Power Circuit16
4.92M ISK
Micro Circuit1,200
4.57M ISK
Conductive Thermoplastic200
3.52M ISK
Artificial Neural Network1,000
924.00K ISK
Interface Circuit28
320.88K ISK
Nocxium0.36
296.1 ISK
Isogen0.82
180.154 ISK
Mexallon2.22
144.7 ISK
Pyerite4.44
83.738 ISK
Tritanium5.56
22.74 ISK
Total Raw Materials Cost (Jita Sell)1.21B ISK
EVE Online is a trademark of CCP hf. All rights reserved.