Standup M-Set TE Research Cost Optimization I Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set TE Research Cost Optimization I
The Standup M-Set TE Research Cost Optimization I rig provides a means for structure operators to decrease cost requirements when performing time efficiency research in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - TE Research Cost Optimization
Volume10 m³
Mass0.2 t
Market
Best Sell Order115.00M ISK
Best Buy Order100.10M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set TE Research Cost Optimization I from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Defective Current Pump3,200
38.08M ISK
Thruster Console3,200
22.76M ISK
Smashed Trigger Unit3,200
14.45M ISK
Burned Logic Circuit320
13.46M ISK
Broken Drone Transceiver3,200
9.02M ISK
Scorched Telemetry Processor3,200
8.04M ISK
Fried Interface Circuit1,600
6.54M ISK
Melted Capacitor Console1,600
5.60M ISK
Charred Micro Circuit3,200
1.17M ISK
Damaged Artificial Neural Network3,200
784.32K ISK
Total Raw Materials Cost (Jita Sell)119.91M ISK
EVE Online is a trademark of CCP hf. All rights reserved.