Standup M-Set TE Research Cost Optimization II Blueprint
Structure Rig BlueprintSearch blueprints...
Production Tree
About Standup M-Set TE Research Cost Optimization II
The Standup M-Set TE Research Cost Optimization II rig provides a means for structure operators to decrease cost requirements when performing time efficiency research in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Characteristics
TypeStructure Engineering Rig M - TE Research Cost Optimization
Volume10 m³
Mass0.2 t
Market
Best Sell Order1.30B ISK
Best Buy Order583.60M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Standup M-Set TE Research Cost Optimization II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit700
375.90M ISK
Impetus Console1,300
131.17M ISK
Telemetry Processor700
119.21M ISK
Current Pump700
88.41M ISK
Logic Circuit16
30.35M ISK
Drone Transceiver700
27.30M ISK
Micro Circuit700
3.83M ISK
Capacitor Console16
2.73M ISK
Artificial Neural Network700
595.00K ISK
Interface Circuit16
304.00K ISK
Nocxium0.36
244.764 ISK
Isogen0.82
151.618 ISK
Mexallon2.22
114.086 ISK
Pyerite4.44
75.613 ISK
Tritanium5.56
21.851 ISK
Total Raw Materials Cost (Jita Sell)779.81M ISK
EVE Online is a trademark of CCP hf. All rights reserved.