IzzyLabbeta

Standup M-Set TE Research Cost Optimization II Blueprint

Structure Rig Blueprint

Production Tree

About Standup M-Set TE Research Cost Optimization II

The Standup M-Set TE Research Cost Optimization II rig provides a means for structure operators to decrease cost requirements when performing time efficiency research in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.

Characteristics

TypeStructure Engineering Rig M - TE Research Cost Optimization
Volume10
Mass0.2 t

Market

Best Sell Order1.32B ISK
Best Buy Order583.60M ISK
Jita 4-4 • Updated just now

Raw Materials Required

Base materials needed to build 1× Standup M-Set TE Research Cost Optimization II from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Trigger Unit700
412.44M ISK
Telemetry Processor700
112.49M ISK
Impetus Console1,300
93.60M ISK
Current Pump700
76.79M ISK
Logic Circuit16
32.26M ISK
Drone Transceiver700
30.32M ISK
Micro Circuit700
4.17M ISK
Capacitor Console16
2.72M ISK
Artificial Neural Network700
721.70K ISK
Interface Circuit16
291.04K ISK
Nocxium0.36
251.964 ISK
Isogen0.82
147.354 ISK
Mexallon2.22
116.994 ISK
Pyerite4.44
79.92 ISK
Tritanium5.56
21.573 ISK
Total Raw Materials Cost (Jita Sell)765.80M ISK
EVE Online is a trademark of CCP hf. All rights reserved.