Worm Blueprint
Frigate BlueprintSearch blueprints...
Production Tree
About Worm
Korako 'The Rabbit' Kosakami, Gurista leader, has a particular love for stealing the Caldari's ship designs, souping them up, and turning them on their creators. With the Worm, he has taken the Merlin design so familiar to Caldari pilots and turned it into a defensive powerhouse capable of firing its volleys at terrifying speeds.
Characteristics
TypeFrigate
Volume16,500 m³
Mass981 t
Jita Market
Best Sell Order66.49M ISK
Best Buy Order62.26M ISK
Jita 4-4 • Updated just nowRaw Materials Required
Base materials needed to build 1× Worm from scratch. Fractional quantities appear when intermediate components are produced in batches (reactions, fuel blocks, etc).
Guristas NET Resonator20
44.26M ISK
Viral Agent16
231.68K ISK
Supertensile Plastics16
228.96K ISK
Mexallon3,000
190.50K ISK
Test Cultures16
159.58K ISK
Tritanium38,400
153.60K ISK
Nanites16
142.37K ISK
Isogen600
131.34K ISK
Pyerite7,200
126.43K ISK
Hydrocarbons90
48.16K ISK
Zydrine24
35.42K ISK
Megacyte12
29.15K ISK
Nocxium36
28.60K ISK
Atmospheric Gases90
20.66K ISK
Oxygen Isotopes18.56
13.27K ISK
Hydrogen Isotopes16.88
10.47K ISK
Silicates30
9.89K ISK
Coolant0.71
6.97K ISK
Evaporite Deposits30
6.89K ISK
Strontium Clathrates1.58
6.86K ISK
Robotics0.08
6.72K ISK
Enriched Uranium0.32
3.53K ISK
Mechanical Parts0.32
3.19K ISK
Liquid Ozone27.56
2.57K ISK
Heavy Water13.39
1.46K ISK
Oxygen1.73
727.65 ISK
Total Raw Materials Cost (Jita Sell)45.86M ISK
EVE Online is a trademark of CCP hf. All rights reserved.